SB 868 explained: California's plug-in solar law
Last updated
The short answer: from , California households can use a certified plug-in solar system without an interconnection agreement, utility approval or utility fees, as long as all the plug-in devices at the home add up to no more than 1,200 W AC.[source] Governor Newsom signed SB 868 on .[source]
This page is not legal advice. Where a point hasn't been checked against the enacted text, we say so.
What the law allows
- No interconnection agreement, advance approval or device fees. Utilities won't be able to require any of these for qualifying systems.[source]
- A per-home limit, not a per-kit limit. The total AC output of all plug-in devices at one home must be 1,200 W AC or less.[source] Two kits that each use more than half the limit would be over it together.
What the system must have
The enacted text, as quoted by Plug-in Solar Hub, says a qualifying system must:[source]
- be designed to connect to and disconnect from your home's wiring through a receptacle (an outlet);
- be certified as a plug-in photovoltaic system by UL or an equivalent nationally recognized testing laboratory;
- include a certified feature that stops it sending power into the grid during a power outage.
You'll often see "UL 3700" on kit listings. That is UL's current test outline for these products; the law itself doesn't name a specific standard.[source] As of March 2026, the Senate committee analysis found that no commercially available balcony solar system had achieved certification yet.[source] That's why most kits in our kit tracker show certification as "Not verified". More in UL 3700 explained.
The same analysis notes that products certified under the current UL framework need a unique plug and a dedicated circuit, which in California means an electrician installs it.[source] See Do I need an electrician?
Registration, not approval
Your utility may ask you to report the system's address, make, model and size through a simple online registration form, but it can't require approval.[source][source] In other words, you don't have to wait for permission before you plug in.[source] If your utility asks you to register, do it.
City and other public utilities are covered too
SB 868 isn't only for PG&E, SCE and SDG&E customers. The Legislative Counsel's digest of the law as signed says it also applies to local publicly owned electric utilities, such as LADWP in Los Angeles or SMUD in Sacramento: they may ask for the same simple online registration, but can't charge fees related to the device or the power it makes.[source][source]
Landlords and HOAs
SB 868 does not appear to override leases or HOA rules. NRG Clean Power's explainer says plainly: "It does not override your landlord" and "It does not override your HOA."[source] The other sources we checked don't address this. Until it's confirmed against the full enacted text, get written permission before you install anything. Our guide for renters includes a permission letter you can send.
Power you send back to the grid
NRG Clean Power says "SB 868 creates no compensation mechanism" for exported power.[source] This is not yet confirmed against the enacted text. Our savings calculator values exported power at $0, so size a kit to what you use during the day.
If you already have rooftop solar
The Senate committee analysis says adding a plug-in system to a home that already has net-metered rooftop solar "may be a gray area", because the existing interconnection agreement may not allow it.[source] Ask your utility before adding one. More in adding plug-in solar when you already have rooftop solar.
When the exemption ends
The utility exemptions in SB 868 end on unless lawmakers extend them.[source][source]
What isn't confirmed yet
- Whether exported power earns anything (we assume it doesn't).
- Exactly how the law interacts with leases and HOA rules (we assume you need permission).
- Which kits will be certified, and when. No kit in our tracker is marked as meeting SB 868 yet.
- How it works alongside an existing rooftop solar system.
What to do next
- Check whether a kit qualifies with four questions.
- Run through seven checks before you buy, and the red flags to avoid.
- Estimate your savings on PG&E, SCE or SDG&E.
- Join the waitlist to hear when certified kits ship in California.
Frequently asked questions
- When can I use a plug-in solar kit in California?
- SB 868 takes effect on Jan 1, 2027. From then, a certified plug-in system within the 1,200 W AC per-home limit doesn't need an interconnection agreement or utility approval.
- Do I need my utility's permission?
- No. Your utility may ask you to register the system's address, make, model and size through a simple online form, but it can't require approval or charge device fees.
- Does SB 868 apply if my power comes from LADWP, SMUD or another city utility?
- Yes. The law covers local publicly owned electric utilities as well as PG&E, SCE and SDG&E. They may ask you to register the system online, but they can't charge fees related to it.
- Does SB 868 let renters install a kit without asking the landlord?
- It does not appear to. NRG Clean Power's explainer says the law does not override your landlord or your HOA. Get written permission first.
- Will I get paid for power I send back to the grid?
- Probably not. NRG Clean Power says SB 868 creates no compensation for exported power. We haven't confirmed this against the enacted text, so our calculator values exports at $0.
Next steps
Sources
- pv magazine: Newsom signs California plug-in solar bill (Oct 2, 2026) (opens in a new tab) · checked Oct 20, 2026
- Plug-in Solar Hub: California and SB 868 (quotes Sections 8530-8531) (opens in a new tab) · checked Oct 20, 2026
- Electrek: California gives the green light to balcony solar (Oct 1, 2026) (opens in a new tab) · checked Oct 20, 2026
- CalMatters Digital Democracy: SB 868 as chaptered (Chapter 985, Statutes of 2026), with the Legislative Counsel's Digest (opens in a new tab) · checked Oct 23, 2026
- pv magazine USA: California legalized balcony solar, here's what homeowners should know (Oren Tamir, NRG Clean Power, Oct 21, 2026) (opens in a new tab) · checked Oct 23, 2026
- KQED: California officially legalizes balcony solar (Sep 30, 2026) (opens in a new tab) · checked Oct 20, 2026
- NRG Clean Power: SB 868 explainer (opens in a new tab) · checked Oct 20, 2026
- CA Senate Energy Committee: SB 868 analysis (Mar 17, 2026) (opens in a new tab) · checked Oct 20, 2026